| Date | Device Name | Quantity | User | Remark | 
| 2017.4~ 2017.7 | Hoist crane boom welding fixture Positioning template and transformer modification | 20 Taiwan | Jierge (Tianjin) Equipment Co., LTD | Large crane arc welding lifting positioning tool and sample. | 
| 2017.6~ 2017.9 | FR COMP SET JIG SPC SET JIG ERSPOT HAND JIG CH CART JIG | 4 units | Wuhan Dongfeng Honda Automobile Co., LTD. Second factory | Honda 2WB project, electric control pneumatic fixture, including on-site introduction. | 
| 2017.6~ 2017.10 | RV model back door flange production line | Three sets | FAW Xiali Automobile Co., LTD | U066 Project RV model back door flange machine modification and front and rear workstation new system. | 
| 2017.8~ 2017.10 | New fixture for front floor line Body assembly line 12 station modification and steel structure | 24 Taiwan | Shandong Yujeima New Energy Vehicle Manufacturing Co., LTD | New production and renovation project of XAD3 electric vehicle welding line | 
| 2017.10~ 2017.11 | External rearview mirror assembly gauge | 4 units | Beijing Guanghua Rongchang Automobile Parts Co., LTD | Aluminum alloy material inspection tool for B40L/B80C model outer rearview mirror assembly. | 
| 2017.12~ 2018.1 | Overboard shell assembly welding fixture Left and right side wall welding fixture Over bridge housing is welded and joined and handheld tooling is used | 5 sets | Aikeda Feng Agricultural Machinery Co., LTD | New type rice harvester manufacturing tooling | 
| 2018.1~     2018.3 | Guorui 350B floor fixture project | 16 sets | Taiwan Guorui Automobile Company | Electrodynamic control fixture, exported to Taiwan. | 
| 2018.2~     2018.5 | Automatic transfer assembly line and complete set of packaging fixtures. | More than 60 sets | Guizhou Wanren electric vehicle general contracting project | Wanren WRE02 pickup truck electric vehicle general contracting project | 
| 2018.2~     2018.6 | Body assembly and floor assembly work station Upper body positioning hanger (OG) | 7 sets | Taiwan's Yulon Automobile Company | MBU1/GPM vehicle body assembly and floor assembly work station, PLC control. | 
| 2018.5~    2018.6 | Spot welding tooling for seed particle crusher frame Post bridge bracket welding fixture Upper frame/back support frame/underframe welding fixture | 6 units | Zhongji Menuo Technology Co., LTD | Arc welding fixture | 
| 2018.6~    2018.10 | LWR BACK robot glue workstation 2W/3W ROOF ASSY JIG 2W/3W MOON ROOF RF ASSY&SEALER 2W/3W Roof RF Seal robot workstation retrofit 3W | 8 sets | FAW Toyota Motor Co., LTD | Through Tianjin Shengji fixture, electric control fixture, robot and workstation and steel structure. | 
| 2018.8~    2018.12 | The cabin and rear floor of the M platform are split Cabin #10~#45 Rear floor #10~#50, lifting equipment between work stations | 20 sets | Dongfeng Yulon Automobile Co., LTD | Pneumatic and electric control fixtures and lifting devices | 
| 2018.10~    2018.12 | Total assembly pallet positioning shaft gauge | One set | Beijing Benz Automobile Company | Square tube frame, stainless steel detection unit. | 
| 2018.8 ~2019.1 | SP OUT SET JIG   | 2 units | Honda (China) Automobile Co., LTD | CHAC 2JA model, pneumatic fixture, including on-site introduction. |