Add:No.8, Tiantuobei Road, Nankai District, Tianjin.
Code:300385
Tel:022-83980118 23368860
Fax:022-83980119
Email:tkt@tkt-cn.com

 
About Us
Current: Home > About Us
 
Date
Device Name
Quantity
User
Remark
2011.1 to 2011.3
The skeleton assembly tailor welded fixture
Review board assembly tailor welded fixture
Backplane assembly tailor welded fixture
Before / after skeleton tailor welded fixture
Tailored Blanks fixture of the inner door panel, etc.
17 units
John Deere Rochester plant
A new excavator cab assembly fixture.
2010.1 to 2011.3
The lower part of the body assembly line (AB PLC)
The left and right side panel assembly line (AB PLC) the B21 models all monomer fixture spreader
120
Sets
Huatai Auto Body Co., Ltd.
Huatai Automobile B21 models addition to the body assembly line (OPEN GATE mode) wire bonding and monomer fixture, spreaders, etc..
2010.10 to 2011.1
Floor assembly fixture body assembly fixture (single / half / double share)
The side circumference assembly fixture
Assembly fixture before the Wai Wai /
Door cover assembly fixture
And 62
Foton Zhucheng Ollin, automobile plant
Era the light truck H1 models (single / half / double) welding production line project, pneumatic clamps.
2010.10 to 2010.12
B / MAIN (SU + MV ROOF) F / MAIN # 20
2
Sets
The Dongfeng Yulon Xiaoshan factory
Roof assembly station and floor assembly (# 20) station, Nissan vehicle types switch, PLC control fixture.
2010.9 to 2010.11
The skeleton assembly tailor welded fixture
Review board assembly tailor welded fixture
Backplane assembly tailor welded fixture
Before / after skeleton tailor welded fixture
Tailored Blanks fixture of the inner door panel, etc.
17 units
The Seattle the Cobo exchange Cab Manufacturing Co., Ltd.
XCG JD-9 excavator cab assembly fixtures, arc welding fixture, pneumatic manual.
2010.8 to 2010.12
Top cover hem fixture
1 set
FAW Car Co., Ltd.
The C131 models top cover day window hem fixture plane, pneumatic electrically controlled fixture.
2010.7 to 2010.10
Body assembly jig
The beam frame assembly fixture floor 1-4 station
The floor assembly Upset repair welding fixture
Front floor assembly jig
42 points
Foton truck
Locomotive & Rolling Stock
The company Zhucheng Austria
Qingling Motors plant
Yu Ling 2370,2500,2700
3 Model collinear project.
2010.4 to 2010.10
DASH PUNCH JIG
RR_MBR_FR_ASSY JIG RR_MBR_ASSY JIG
RR_FLOOR_ASSY JIG
R / I ASSY JIG WH * RI A
SSY JIG FR_FLOOR_TACK JIG UNDER_RR_ASSY JIG, etc.
22:32
GAC Toyota Motor Co., Ltd.
The GTMC 314A welding fixture projects.
2010.4 to 2010.5
Upper / lower rack harvester welding jig
8 units
John Deere Agricultural Machinery (Ningbo) Co., Ltd.
Combines with welding fixture, manually, with a flip.
2010.2 to 2010.5
The body assembly fixture (collectively gantry)
Body assembly jig (floor)
Wai assembly fixture before the body assembly the repair welding fixture and transport mechanism
After confining the assembly fixture
Top cover assembly fixtures, etc.
22:25 Desk
Foton Motor Co., Ltd. Zhucheng Aoling car factory
Fukuda F6 card body assembly line project, pneumatic clamps.

FrontPage    [1]  [2]  [3]  [4]  [5]  [6]  [7]  [8]  [9]  [10]   NextPage  
 
CopyRight 2023 All Right Reserved TIANJIN KOKUSAI TEKKO WELDING EQUIPMENT CO.,LTD  
TEL:022-83980118 23368860  FAX:022-83980119