About Us
Current: Home > About Us


Date

Device Name

Quantity

User

Remark

2023.6~    2023.10

Threshold automatic assembly tightening station

One set

Shenzhen Shantou Welding Line 2, BYD Automobile Industry Co., LTD

Robot gripper servo drive tightening mechanism and tightening

Gun, realize automatic tightening of multiple screws for multiple models.

2023.7~    2023.10

Overhead slide platform for robot assembly line of GAC Honda AF

One set

GAC Honda Automobile Co., LTD

Seven axis slide table for total assembly conveyor line robot.

2023.9~    2023.11

Total assembly line servo tightening machine and truss robot project

8 sets

Chery Automobile Co., LTD

Chery Chaoshan Second Assembly factory

Three-axis servo drive tightening mechanism and truss robot slide table.

2023.11~    2023.12

3DA SPO rear light positioning mechanism additional specification modification

One set

GAC Honda Automobile Co., LTD. Third factory

 

2024.2~    2024.4

Coating workstation base coating system project

One set

Shaanxi Heavy Automobile Co., LTD

Multi-axis automatic glue coating device.

2024.3~    2024.5

Intelligent assembly workstation for car doors and vehicle grasping and transporting device

One set

Tesla overseas factory

 

2024.2~    2024.6

Robot seven axis slide table project

One set

China Automotive Engineering Corporation

Intelligent island type automatic vehicle assembly line research and development.

2024.8~    2024.10

Jianghuai Automobile truss robot project

1 set

Anhui Jianghuai Automobile Group Co., LTD

Visual inspection truss robot (3 axes) for total assembly line production.

2024.10~    2025.1

Brazilian BYD frame flipping machine project

1 set

VATI assembled factory in Brazil

3-axle frame flipping machine +4 column frame lifting device.

2024.11~    2025.1

Xi 'an BYD phase III flipping machine and door rubber strip station opening device renovation project

2 sets

Xi 'an BYD final assembly plant (Phase III)

 

2024.11~    2025.2

Seven axis project of welding line robot in BYD, Brazil

77 sets

Brazil BYD welding plant 1 (No.5 workshop)

Cast robot seven axis (3.5~11.5M).

2025.3~    2025.4

Zhengzhou BYD phase I frame flipping machine renovation project

1 set

Zhengzhou BYD Assembly plant (Phase I)

 

2025.5~    2025.7

Zhengzhou BYD Phase III frame flipping machine project

1 set

Zhengzhou BYD final assembly plant (Phase III)

The 600kg frame realizes the linkage of horizontal, vertical and flipping three axes.

 

Japan International Iron Works, Taiwan Zhongshi and other companies commissioned a variety of fixture design and manufacturing

More than 50 points/year

Overseas manufacturers

 

 export item 



 [1]  [2]  [3]  [4]  [5]  [6]  [7]  [8]  [9]  [10]  [11]  [12]  [13]  [14]  [15]  [16]  [17]  [18]  [19]  [20]  [21]   NextPage  
 
CopyRight 2023 All Right Reserved TIANJIN KOKUSAI TEKKO WELDING EQUIPMENT CO.,LTD  
TEL:022-83980118 23368860  FAX:022-83980119